Sl.No.
Particulars
Existing
Under construction which is likely to be completed before Jan’ 2010
Building with RCC roof (in Sqm)
Building with sheet roof (in Sqm)
Building with RCC roof (in sqm)
Building with Sheet roof (in Sqm)
I
Academic/ Institutional area
295.60
3090.10
----
Administrative Area
180.80
394.30
-----
III
Amenities and Students Facilities
234.00
816.30
10000 sq.ft
IV
Total Area (In Sqm)
710.40
4300.70
Sl. No.
Under construction which is likely to be completed before Jan. 2011
Building with RCC roof (in Sqmt.)
Building with sheet roof (in Sqmt.)
i.
Hostels for Boys
500 Sqmt.
ii.
Hostels for Girls
iii.
Staff Quarters
250 Sqmt.
iv.
Others
Total Area (in Sqmt.)
1250 Sqmt.
Particulars (as applicable)
Proposed (likely to be completed by Jan. 2011)
Number
Approx area of Each (Sqmt)
Total Area (Sqmt)
Class Room
04
120 Sqmt.
480 Sqmt.
Tutorial Room
01
60 Sqmt.
02
Seminar Hall
300 Sqmt.
Drawing Hall
200 Sqmt.
v.
Computer Centre
vi.
Library
vii.
Laboratories (including Comp. Lab. & excluding Computer Centre)
1200 Sqmt.
02 (2nd )
600 Sqmt.
viii.
Work Shop
ix.
2560 Sqmt.
1820 Sqmt.
VISION:
To build in our budding technocrats the ability and the confidence to stand on their own and to carry the latest break-through in science and technology from the lab to the land.